Opening of the bridge connection across the rivers Kama, Arkharovka and Kurlyanka in Tatarstan was held on October 18. Among the participants of the grand meeting were Tatarstan President M.Shaimiev, RF Minister of transport S.Frank, RF Minister of property F.Gazizoullin, RT Prime Minister R.Minnikhanov, Chairman of the RT State Council F.Mukhametshin, RT Minister of transport and roads V.Shvetsov, other officials.
Today it is possible to say that the bridge was built by the whole republic. Capacities available in Tatarstan allowed to realize the project, using both experience and new technologies. The Gorky Ship-yard made metal constructions of the bridge spans, hydraulic works were done by ZAO "Tattransgidromekhanizatsia", part of work was executed by the trust "Kazdorstroi". The bridge aross the Kama - the crucial part of the whole connection - was built by Bridge brigade N3 of OAO "Volgomost". Looking at the delicate outlines of the bridge and knowing that it is assembled from multiton constructions, we cannot but admire the work of these people. The bridge brigade N 113 had to do the uneasy site - bridges across Arkharovka and Kurlyanka, an overbridge at the traffic intersection. The total length of the bridge connection is 13967 m, including bridges: across the Kama - 1608 m, across the Arkharovka river - 549,9 m and the Kurlyanka river - 69,8 m.